Sheet 01Clearing and setting out
The site is cleared, the welfare and access are sorted, and the house is set out from the drawings. Levels and drainage runs are fixed now, because everything after this is built from them.
Services · NEW
Detached houses and garden buildings from foundations up, including sustainable build methods and off-grid heating.
A recent new build, finished. See how a house goes up, stage by stage.
Building a house from nothing is a different job from working on one that already exists. There is nothing to work around, which makes the build more straightforward, and everything has to be decided in advance, which makes the preparation matter far more.
Nearly every trade is on our own books, and that matters more on a new build than on anything else we do. A new house has a lot of trades working in sequence, and the usual reason a build slips is waiting on a subcontractor who has been pulled onto somebody else’s job.
We work from the architect’s drawings and the structural engineer’s design, and take the house from setting out through to handover.
Before you buy a plot
Most plots around here are infill: a large garden with room for one house, a site where something has been demolished, or a paddock at the edge of a village.
A plot sold with outline permission has agreed the principle of a house, not its design, and reserved matters still have to be approved. A plot with full permission is a much shorter road.
Ground conditions set the foundation, and the foundation is the biggest single variable in a new build price. Trees, made ground or a high water table can mean piling or a raft rather than trench fill. A site investigation before you commit is money well spent.
On a new build the architect matters more than on any other job. If you have not appointed one yet, come to us first and we will introduce you to one from our list whose designs we know we can build.
The build
Photographs from our recent new builds, in the order a house goes up.
Sheet 01Clearing and setting out
The site is cleared, the welfare and access are sorted, and the house is set out from the drawings. Levels and drainage runs are fixed now, because everything after this is built from them.
Sheet 02Foundations
Trenches are dug to the depth the ground and the engineer call for, and Building Control inspects them before any concrete goes in. Where the ground is poor or there are trees nearby, this is where piling or a raft comes in instead.
Sheet 03Floor and walls
A beam and block ground floor goes across the foundations, then the walls rise in brick and block, with lintels, cavity insulation and wall ties going in as the courses go up. This is our own bricklayers’ work from start to finish.
Sheet 04Roof and dormers
Trusses are craned into place, then the roof is felted, battened and tiled. Dormers and roof windows go in with it, so the house is weathertight and the inside can start drying out.
During
After Sheet 05Inside, and handover
First fix, plastering, second fix, then the kitchen, bathrooms and decoration. Outside, the scaffold comes down and the drive, paths and garden go in.
Building Control inspects throughout, and an air tightness test is done before completion. At handover you get the completion certificate and every guarantee in one file.
What we build
Groundworks to handover, with our own trades doing nearly all of it.
Garages and outbuildings
A good part of this work is detached garages, garden rooms, workshops and annexes. Many outbuildings fall under permitted development, but where it sits decides that more than its size: how close it is to the boundary, and whether it is forward of the front of the house. Worth checking before you plan around it.
We are so happy with the work Anthony and his team carried out for us. We needed a new garage on a tricky site to build on. Anthony brought his wide-ranging expertise to each stage of the planning and build. Really friendly, attention to detail and good communication with costings and materials. The end result is a high standard of work and we're so pleased with the results!
Regulations and VAT
New builds are inspected against Building Regulations throughout, not just at the end, and the standards have moved a long way. Part L now drives the fabric specification and the heating strategy, and Part O means overheating has to be designed out as well as heat loss.
New dwellings are zero-rated for VAT. That is worth knowing early, because it changes the real cost of building new against extending, and it affects how the invoicing should be set up.
Straight answers
Yes, and we are happy to be involved early. Getting a builder to price a design before it is finalised usually saves money, because we can flag the details that are expensive to build.
Yes. On a new build the architect matters more than on any other project, and we have a list of architects we have built for over many years. Come to us first and we will put you in touch with the right one for your plot and your budget.
Yes. Most garden buildings under 2.5 metres high fall within permitted development, but there are conditions about how close to the boundary they sit and how much of the garden they cover. We check before quoting.
Where we work
Get started
Send the address, any drawings or planning you have, and a rough idea of what you want to build. We’ll come back with honest thoughts on what’s realistic and roughly what it costs, before anyone books a survey.