Single storey rear
The most common job: a dark kitchen opened up into the garden, often with bifolds or sliders across the back and roof lights over.
Services · EXT
Single and two-storey, side returns and wrap-arounds. Foundations, structural steels, roofing and glazing all handled in house.
Two recent extensions: a metal-clad gable at the back, and a cedar-clad entrance at the side.
Most of the extensions we build are on the back of a house, opening a dark kitchen into the garden. Whatever the shape, the work is the same: get the ground and the structure right, and the rest of the job runs to plan.
Sindall building contractors have just finished a single story kitchen and utility extension for us, and we are delighted we the result! Anthony was totally focused on the build, always punctual polite and professional. He was able to problem solve and made helpful suggestions along the way and always kept us up to date on progress. His team were friendly and we were impressed with how tidy they kept the site. Anthony project managed all the trades to come in as needed, which wasn't easy as we kept getting held up by rain. The job was completed to a very standard and we would highly recommend.
Recent extensions
Most are on the back of the house. Some are side returns, some go up two storeys, and a few wrap round the corner to do both at once.
The most common job: a dark kitchen opened up into the garden, often with bifolds or sliders across the back and roof lights over.
More room downstairs and an extra bedroom or bathroom above. Almost always a planning application, and well worth the architect’s time.
Glazing taken round a corner, so the room opens to the garden on two sides. It needs careful structure above, which is the part we take most care over.
What the work involves
The first two are the ones that decide whether the price holds, so that is where we spend the most care.
We dig trial holes before pricing where there is any doubt. Depth is set by the ground and what is near it, and drains almost always need moving or building over.
Taking out a rear wall means steel to carry what is above it. The beam is sized by an engineer, bears on padstones, and the wall is needled and propped while it goes in.
Brickwork or render, roof, insulation and glazing. This is where the extension starts to look like a room.
Electrics, plumbing, plastering, flooring and decorating, all by our own trades, so nobody is waiting on anybody.
Start with the right architect
The right architect is key to a good extension. Over the years we have built alongside a handful we trust, from the first sketch to completion, and we will put you in touch with the one who suits your house and your budget.
An architect who knows how we build draws something we can price accurately and build as drawn, without the redesign that happens when a scheme comes back over budget. If you already have one, we are just as happy to work from their drawings, and to comment early while changes are still cheap.
Before work starts
Plenty of single storey rear extensions fall under permitted development. The limits are tighter on terraced and semi-detached houses, and the rights are restricted or removed in conservation areas and on listed buildings. Two storey extensions almost always need an application.
Building Regulations apply either way. So does the Party Wall Act if you are building on or near a shared boundary, which means serving notice on your neighbours before work starts. We handle the applications as part of the job.
Our quote is written against the drawings and covers labour, materials, plant, waste and the trades needed to finish. Anything that cannot be known until we open up, such as a foundation or a drain run, we point out before we start.
Straight answers
Call us first. We have a list of architects we trust and have built for over many years, and we will put you in touch with the right one for your extension. Their designs come to us ready to build, which keeps the quote clear. If you already have an architect, we are just as happy to work from their drawings.
Many single-storey rear extensions fall under permitted development, but limits differ for terraced, semi-detached and detached houses, and permitted development rights are removed in conservation areas and on listed buildings. We check this at survey stage and handle the application either way.
Most single-storey rear extensions take twelve to sixteen weeks on site once we start, depending on groundworks and whether the kitchen is being replaced at the same time.
Cost depends on footprint, ground conditions, how much glazing you want and the level of finish. We give a clear written quote against the drawings rather than a rate per square metre, so you know what is included.
Where we work
Get started
Send drawings if you have them, or a few photos of the back of the house and a rough idea of what you want. We’ll come back with honest thoughts on what’s realistic and roughly what it costs, before anyone books a survey.